Our logistical development arrived to a milestone

Our Faedra Park development’s building has received its trapezoidal sheet metal roofing, marking the handover of the work area for thermal and waterproofing insulation. Meanwhile, sandwich wall panels are being installed in their designated positions, and the ‘box’ is closing. The basic installations and mechanical-electrical works are underway inside the hall, and the construction is progressing as planned.

Sharing:

Related articles